How do we know our envelope is failing before there's an obvious leak?
Signs precede leaks by months or years: paint bubbling, hairline cracks at window corners, efflorescence (white salt deposits) on exterior masonry, musty odour in suites adjacent to exterior walls, or staining at baseboard level. Any of these warrant an assessment before water infiltration causes structural damage. We offer a preliminary assessment service for buildings showing early symptoms.
What's the difference between an assessment and a full investigation?
An assessment is visual and non-invasive: we walk the exterior, map suspect zones and give you a written opinion on the likely failure modes and their severity. A full investigation may involve probe testing, moisture meters, selective destructive testing (removing a cladding panel or opening a wall cavity) to confirm the diagnosis. We typically recommend an assessment first, then escalate to investigation only where the findings warrant it.
Do you do the repairs?
No. Strata Engineering designs remediation and oversees construction, but we do not self-perform repairs. This is deliberate. An engineer who also bids on the repair has a conflict of interest in the diagnosis. Our independence means your council can use our design documents to get competitive bids from qualified contractors, with confidence that the scope reflects what the building actually needs.
Will residents need to vacate during an envelope remediation?
Rarely for the full building, but individual units adjacent to active work areas may need temporary protection measures. Most recladding projects on occupied residential buildings are phased so that residents are inconvenienced for short windows rather than displaced. The tender documents we produce include staging and occupancy requirements so contractors bid with full awareness of the constraints.
How does envelope consulting relate to our depreciation report?
The depreciation report quantifies the remaining service life of your envelope components and models their replacement costs. The envelope consulting engagement investigates active failures and designs remediation. The two are complementary: if our envelope assessment identifies damage not captured in your depreciation report, it typically triggers a depreciation report update to revise the reserve fund projections. We can coordinate both services.
How long does envelope work take from first assessment to construction completion?
A typical sequence: assessment (2-4 weeks), report (2 weeks), remediation design (4-8 weeks depending on scope), tender period (3-6 weeks), construction (varies widely by scope, from 4 weeks for localized repairs to 12-18 months for full recladding). We can accelerate or phase any stage depending on the urgency of active water damage and the council's budget timing.